2021-01-05 1). Lay out wall lines a. Clean up the field and lay out wall lines according to construction drawings. b. Lay out position control lines at the top of concrete beam, floor slabs, side concrete columns and door-window openings. c. Control the verticality and flatness of the wall, the position and elevation of the door-window openings. 2). Preparation before installation 3). Installation of panel