1). Lay out wall lines a. Clean up the field and lay out wall lines according to construction drawings. b. Lay out position control lines at the top of concrete beam, floor slabs, side concrete columns and door-window openings. c. Control the verticality and flatness of the wall, the position and elevation of the door-window openings. 2). Preparation before installation 3). Installation of panel
1. Wall slotting:Before cutting the wall, you have to wait until the wall reaches a certain strength. While cutting the wall, you need to use the light electric cutting machine; the depth of the groove should no more than 1/3 of the wall thickness. Cement mortar is used to mend the groove after the
According to a new market report published by Transparency Market Research titled ‘Autoclaved Aerated Concrete Market – Global Industry Analysis, Size, Share, Growth, Trends, and Forecast, 2019–2027,’ the global autoclaved aerated concrete market was valued at around US$ 11.9 Bn in 2018 and is proje
According to the U.S. Census Bureau, prefabricated wood building manufacturing in the United States brought in just over $2 billion in annual revenue in 2011. This year, it’s expected to surpass $4 billion.Relatedly, revenue for prefabricated metal building manufacturing was a bit higher, coming in