AAC PANEL

Home / AAC Panel 1

Product  Name

Height/Length  (mm)

Width/Height (mm)

Thickness (mm)

Average Cubic Compression Strength (MPa)

Average Dry Density (kg/m3)

AAC Internal Block

600

≤250

100

≥3.5

≤525

AAC Internal Block

600

≤250

120

≥3.5

≤525

AAC Internal Block

600

≤250

150

≥3.5

≤525

AAC Internal Block

600

≤250

200

≥3.5

≤525

AAC Internal Block

600

≤250

240

≥3.5

≤525

AAC Internal Block

600

≤250

250

≥3.5

≤525

AAC Internal Block

600

≤250

300

≥3.5

≤525

AAC External Block

600

≤250

150

≥5.0

≤625

AAC External Block

600

≤250

200

≥5.0

≤625

AAC External Block

600

≤250

240

≥5.0

≤625

AAC External Block

600

≤250

250

≥5.0

≤625

AAC External Block

600

≤250

300

≥5.0

≤625

AAC Thermal Insulation Block

600

≤250

40

≥2.0

≤425

AAC Thermal Insulation Block

600

≤250

50

≥2.0

≤425

AAC Thermal Insulation Block

600

≤250

75

≥2.0

≤425

AAC Thermal Insulation Block

600

≤250

100

≥2.0

≤425

CONSTRUCTION METHOD

Step 1

5 workers form a group. Use hydraulic trolley for transportation. Panels should be kept flat during the transportation. Pulling on the floor or unilateral support is forbidden during transportation. Use special fixture when lifting. Hoisting belt should be flexible nylon tie belt.

Step 2

Use 1:3 cement mortar on the bottom of the panel to make level, mortar thickness is 10-20mm.

Step 3

While installation, one worker uses a chain hoist to make the panel stand up, other workers stabilize the panel to the corresponding location.

Step 4

Each panel should be connected to major structure by a special U-Card which is shot on the panels by nail gun.

Step 5

After panel is upright, adjust the verticality by a wadge stuffed on the bottom of the panel.

Step 6

Groove between panels to bite each other should be close. Pay attention to control the verticality during the installation, and check up carefully after installation.

Step 7

Gap between panels to be caulked by special mortar, and extra mortar should be pushed out while connecting panels. Then clean up adhesive cracks between panels, and use specialized pointing mortar to fill up gaps and level out.

Step 8

To avoid cracking on gaps between panels, cover the adhesive gap with a layer of 200mm wide alkali-resistance fibre mesh.

Step 9

Finished

PACKING AND SHIPMENT

Shipment by container liner, one twenty-feet container can load about 23cubic meter/ 18 pallets/ 16000kgs.
Wooden pallet with plastic steel strips and corner protectors on all sides for ALC Panels.
Delivery time: 15-30 working days after receive your deposit.

FAQ

  • Q What is the relationship between Hangzhou Huafei Express Import and Export Co., Ltd and Ecotrend (Cambodia) New Building Materials Development Co., Ltd?

    A They share the same shareholder. HuaFei Express is the marketing center located in China. Ecotrend is the manufacturer of AAC/ALC product established in Cambodia. 
  • Q Who will we sign contract with?

    A Normally with Ecotrend for AAC/ALC products and the shipment will be made directly from Cambodia. If you’d like to buy the accessories of ALC products, you will sign contract with Huafei Express.
  • Q Which port will you export your products?

    A For AAC/ALC products, we will export from Sihanouk Ville Port, Cambodia; for accessories or other related products, we will export from Shanghai or Ningbo Port, China.
  • Q What is your lead time?

    A Usually within about 15-20 days after receiving your deposit or L/C.
  • Q What is your payment terms ?

    A 50% deposit by T/T advance and 50% balance by T/T before loading; L/C is accepted as well.

LEAVE A MESSAGE

CONTACT US NOW
If you would like to have a question then get in touch today, we are ready to assist 24/7. We welcome your cooperation and we will develop with you.
  Factory-direct Connectivity Solutions.
  High quality, Competitive Price.
  Custom-tailored solutions.
  Problem-solving approach.
CONTACT US

CONTACT US NOW

Specializing in the development, manufacture and export of eco-friendly, energy-efficient new building materials --- autoclaved aerated concrete (autoclaved lightweight concrete) products. Ecotrend is the largest and only ALC panel manufacturing enterprise with green prefabricated building material in Cambodia.

QUICK LINKS

CONTACT INFO

 HEADQUARTERS

Hangzhou Huafei Express Import and Export Co.,Ltd. (Marketing Center)

 Room.1101, Huijin Financial Center, No. 148 Jincheng Road, Xiaoshan District, Hangzhou City, Zhejiang, China.
0086-571-82998292


 FACTORY
Ecotrend (Cambodia) New Building Materials Development Co., Ltd.

Sihanoukville Special Economy Zone, National Road # 4, Phum Pou Thoeung, Bet Trang Commune Prey Nob District, Sihanoukville Province, Cambodia.

 00855-16-771-003
 
Copyright © 2020 Ecotrend (Cambodia) New Building Materials Development Co., Ltd. All Rights Reserved.Powered by HI-eweb.com