1. The main installation accessories


a) Hook Bolt

hook bolt

Hook Bolt


b) Strutting piece

Strutting piece

 Strutting Pieces

 

The connection mode: Welding

 

Ecotrend AAC wall panel can be installed horizontally or vertically.


Horizontal installation node

vertical installation node

 


2. The basic installation condition


a) Long angle iron, Leveling angle iron, Reinforcing angle, and the welding of strutting piece


Long angle iron Leveling angle iron

Reinforcing angle welding of strutting piece

 


3. Transporting the Ecotrend AAC external wall panels to the operating radius of the crane


Transport

 


4. Lay out wall lines according to construction drawings


5. Drilling in the Ecotrend AAC panel


Drilling in

 


6. Lifting the Ecotrend AAC panel to the installation area by crane


Lifting


 

7. Installing the hook bolt and welding, do not forget apply the anti-rust paint to welding area


Installing the hook bolt and welding

 


8. Strutting pieces are added every 3 to 5 panels according to span requirements


Strutting pieces

 


9. Repair the bolt holes and joints with the waterproof sealant


Repair the bolt holes joints with the waterproof sealant



10. Coating the waterproof mortar on the façade


11. Making water proof putty or exterior decoration